/SCMTMS/GNT_PLN - Interactive Gantt Chart

The following messages are stored in message class /SCMTMS/GNT_PLN: Interactive Gantt Chart.
It is part of development package /SCMTMS/GNT_PLN in software component TM-PLN-GNT. This development package consists of objects that can be grouped under "Backend planning functions for Gantt Chart".
Message Nr
Message Text
001Document &1 assigned to resource &2
002Error occured on frontend: &1
003Can't cancel resource/equi type assignment; status of document &1 is "&2"
004Reassignment not possible; only reassign one activity at a time
005Coupling not possible; only reassign loading and travel activities
006Reassignment not possible; reassign travel act. only within a document
007Reassignment not possible; only reassign one document at a time
008Reassignment not possible; invalid drop activity
009Reassignment not possible; only reassign one document type at a time
010Document &1 cannot be deleted
011Resource or equipment type &1 cannot be deleted
012Reassignment not possible; invalid drop position
013Document &1 cannot be deleted, status is "&2"
015Manual plan strategy &1 incompatible with Gantt chart; time not updated
020Scheduling not possible for selected documents, resources and equi. types
021Scheduling not possible; no doc. assigned to selected res./equi. types
025Can't solve driver missing stage via context menu, use assignment instead
030Stage between &1 and &2 missing
031Stage between &1 and downtime at location &2 missing
032Stage between downtime at location &1 and &2 missing
033Stage between downtime at location &1 and downtime at location &2 missing
Privacy Policy